🐾 Unleash Adventure with Every Walk!
The Long Leash Waterproof Training Lead is a heavy-duty, durable dog leash designed for outdoor activities. Made from high-quality materials, it offers a strong pulling capacity, tangle-free functionality, and waterproof features, making it ideal for training, beach outings, and camping adventures. Available in multiple colors and lengths, it combines comfort and style for both you and your furry friend.
Item Dimensions L x W | 360"L x 0.4"W |
Size | 30FT / HANDLE |
Pattern | Dog |
Color | Vitality Orange |
Closure Type | Tockfit |
Material Type | Polyvinyl Chloride |
E**K
Perfect!
I have a 6 pound dog and it was perfect for her. It was not heavy and very sturdy. I highly recommend.I hope my review is helpful
T**E
Love!
I got this lead for competing in NASDA trials with my labrador. Needed a 30 ft line that was easy to handle and didn't get tangled easily in itself or brush. I love this lead, it is exactly what I was looking for. My lab is pretty high drive and it hasn't broken or gotten damaged. I did cut the foam piece off the handle because I didn't need it.
V**.
Love this, it's absolutely helping for off-leash training
I have a dog that loves the keepaway game when we're outside offleash and I then need to figure out ways to either fetch him or get him to come. Enter this leash, which I attach to him and then drop so he trails it behind. It's lightweight enough and smooth enough not to snag, but my small dog is aware he's attached to something, so he doesn't try to run off. The color helps me see exactly where he is also. It's a good length and since it's silicone, dirt quickly rinses off. Win win.
C**1
Beach Leashes
I bought two of these, specifically for beach use. I’ve bought two other leashes prior and it was super annoying to wash out. The sand just took forever to wash off. Also the clasp got stiff from the ocean and sand.These leashes withstand the ocean and sand. Easy to wash off and the clasp doesn’t get stiff. Im glad I bought these. I also bought the 10ft length bc I wanted my children to be able to walk the dogs confidently and not have too much slack. These were great for my mid 40lb dogs.
B**E
Lil off colour, but good otherwise
Edit: Will probably still use it or oil it, but sad to say the clasp got wet in the rain/mud while camping/floating, and now it doesn't open smoothly and makes a little creaking noise, and sometimes the spring catches so it needs assistance to push back to closed. Hopefully I can fix it, but I guess as long as it still opens and closes I can make it work until then.Not really an outdoors leash, but the rope didn't snap and nothing came off, maybe just suited for walks and fashionability...The green is a little darker than the pic but is exactly as shown otherwise. Seems durable despite being kind of thin, taking it on a float trip in a couple weeks; will update review if anything breaks.
C**E
Nothing bad to say about it.
I love this leash. I have 3 now. I keep one in my car and one in my husband's car. I've used it in water. Its fantastic. Comfortable to hold. Sometimes I wrap it around me like a crossbody bag and feed the hook through the hand loop for hands-free walking with a short leash. I love it.
N**.
Excellent!
We got so much use out of these leashes this vacation and I’m sure we will be using them very often. Soft, grippy, water proof, perfect for the beach. ( remember to rinse the salt water) The handle floats too!
P**.
Not as described
Not round as described. Was 50’ long instead of 30’. The handle was not padded as pictured. The buckle is far cheaper looking than in the picture. Not at all the item pictured. Will be returning
K**R
Clip is flimsy and weak.
Clip is flimsy and weak, not safe for your dog,as won't take much to break or unclip itself. Returning lead, which I'm very disappointed to have had to do, because it took me ages to find a round black biothane lead instead of flat. Foam on handle won't last long either, but I wasn't so concerned about that because I'd prefer to cut it off anyway.
S**A
Decent
Bought this just before summer && it’s good, easy to wash, tough for small && most medium dogs, but it’s started to get black dots on it (looks like mold) other than that, perfectly good leash
C**T
Perfect
I was looking for a light weight, waterproof leash for my 14 pound Chihuahua mix ! I live in Quebec City, Canada, and we get lots of snow, slush, rain..... so it absolutely needed to be waterproof! This leash is PERFECT!
C**N
Finally! A 10ft leash that is light enough my my 7 lb dog.
It actually has very weird! It is so light I feel like she’s not even on the leash! The clip fastener is finally small enough. Will be great if it gets wet. Only had 1 day but I’m happy.
B**N
The leash can cut across your Achilles tendon Ike mine did. It gave me a deep gash.
Like the weight the length the handle.
Trustpilot
Hace 1 mes
Hace 3 semanas