---
product_id: 690923404
title: "The VoIP Lounge Handset (includes 9' cord with long lead) for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360"
price: "Bs.1028"
currency: BOB
in_stock: true
url: https://www.desertcart.bo/products/690923404-the-voip-lounge-handset-includes-9-cord-with-long-lead
store_origin: BO
region: Bolivia
---

# The VoIP Lounge Handset (includes 9' cord with long lead) for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360

**Price:** Bs.1028
**Availability:** ✅ In Stock

## Quick Answers

- **What is this?** The VoIP Lounge Handset (includes 9' cord with long lead) for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360
- **How much does it cost?** Bs.1028 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.bo](https://www.desertcart.bo/products/690923404-the-voip-lounge-handset-includes-9-cord-with-long-lead)

## Best For

- Customers looking for quality international products

## Why This Product

- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Description

The VoIP Lounge Handset (includes 9' cord with long lead) for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B07CMG3Q6Z |
| Answering System Type | Digital |
| Best Sellers Rank | #113,848 in Office Products ( See Top 100 in Office Products ) #38 in VoIP Telephone Handsets |
| Brand | The VoIP Lounge |
| Color | Black |
| Compatible Devices | Mitel 5300 Series IP Phones (5304, 5312, 5320, 5320e, 5324, 5330, 5330e, 5340, 5340e, and 5360), Mitel 5212, and Mitel 5224 |
| Customer Reviews | 4.3 out of 5 stars 34 Reviews |
| Dialer Type | Single Keypad |
| Enclosure Material | Plastic |
| Item Highlight | 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360 |
| Manufacturer | The VoIP Lounge |
| Material | Plastic |
| Mfr Part Number | TVL5300HSC |
| Model Number | TVL5300HSC |
| Multiline Operation | Single-Line Operation |
| Number of Items | 1 |
| Number of Packs | 1 |
| Power Source | Does Not Apply |
| Telephone Type | Corded |
| Unit Count | 1 Count |

## Product Details

- **Answering System Type:** Digital
- **Brand:** The VoIP Lounge
- **Caller Identification:** No
- **Color:** Black
- **Dialer Type:** Single Keypad
- **Material:** Plastic
- **Multiline Operation:** Single-Line Operation
- **Power Source:** Does Not Apply
- **Telephone Type:** Corded

## Images

![The VoIP Lounge Handset (includes 9' cord with long lead) for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360 - Image 1](https://m.media-amazon.com/images/I/41At5RMfTTL.jpg)

## Frequently Bought Together

- The VoIP Lounge Handset with Curly Cord with Long Lead for Mitel 5300 Series IP Phones 5304 5312 5320 5320e 5324 5330 5330e 5340 5340e and 5360
- Telephone Cord, Phone Cord,Handset Cord, Black, 2 Pack, Universally Compatible
- Mitel 5330e IP Phone (50006476)

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.bo/products/690923404-the-voip-lounge-handset-includes-9-cord-with-long-lead](https://www.desertcart.bo/products/690923404-the-voip-lounge-handset-includes-9-cord-with-long-lead)

---

*Product available on Desertcart Bolivia*
*Store origin: BO*
*Last updated: 2026-11-17*